Every step is documented. The batch number travels from raw material to shipment; the inspection certificate is delivered with the product.
Incoming hot-rolled seamless or welded green tube is checked against the mill certificate; the grade code and batch number are carried throughout production.
Surface oxides are removed and a lubricious carrier layer is applied for drawing. This is the step at which surface roughness is established.
Diameter and wall thickness are reduced to target by mandrel or sink drawing. Multi-pass drawing is applied according to the required tolerance class.
Normalising anneal, post-draw anneal, or quench + temper in a protective-atmosphere furnace. Delivery condition is locked in at this stage.
Straightness is measured in mm/m; the tube is cut to the requested length and left with clean, square, burr-free ends.
Dimensional, surface, and mechanical values are recorded; the inspection certificate is dispatched together with protective lubrication and packaging.
Every batch ships with its own data. Dimensional and surface checks are performed in-line; mechanical and metallographic tests in the lab — all results archived by batch number.
Automotive & supply industry
shock absorber · steering · driveline
Hydraulic & pneumatic
cylinder · valve block · line
Construction machinery
jack · boom · hoist group
Agricultural machinery
gearbox · shaft · lifter
Defence industry
barrel · 4140 heat-treated
Plumbing & general manufacturing
line · machine elements